RESUMES
of KEY PERSONNEL:
CHARLES C. YOST, III
EDUCATION
and
PROFESSIONAL AFFILIATIONS
Iowa State University, Ames, Iowa, B.Sc., Chemical Engineering, 1965
University
of Wyoming, Laramie, Wyoming, MBA (Honors), 1978
Member:
American Institute of Chemical Engineers, Society of Petroleum Engineers,
American Petroleum Institute, Houston Engineering & Scientific Society,
and Gas Processors Association.
Will
be a Sr. Consulting Engineer on the project.
Nationality:
Born/citizen of USA
return
to top>>
EMPLOYMENT
| 1985
to present |
|
Merlin
Associates, Houston, Texas
Principal, President and Sr. Consulting Engineer; responsible
for administration of the Engineering Department. Work as project
manager and process engineer on various projects. Responsible project
engineer for several Gulf Coast offshore platform process designs. |
|
|
|
| 1982
- 1984 |
|
S.
H. Landes, Inc., Houston, Texas
Engineering Manager; responsible for administration of Engineering
Department. Worked as systems engineer, project manager, process engineer,
project engineer and safety engineer providing services such as process
flow diagrams, equipment and line sizing, computer control system
design and specification, feasibility and conceptual design studies,
preparation of cause and effect diagrams and logic diagrams. Author
and teacher of S.H.L. Inc. Production Engineering Design school and
Offshore Drilling and Facilities school. |
|
|
|
| 1981
- 1982 |
|
Atlantia
Engineering Company, Houston, Texas
Chief Process Engineer; responsible for Process and Instrument
design, specification and selection for offshore production processing
platforms. |
|
|
|
| 1971
- 1980 |
|
Wycon
Chemical Company, Cheyenne, Wyoming
VP Manufacturing, Plant Manager, Oper. Manager, Maintenance
Mgr. and Manager of Technical Services. Full product line nitrogen
fertilizer manufacturing from natural gas. |
|
|
|
| 1973
- 1974 |
|
Ball-Reid
Engineers, Inc., Oklahoma City, Oklahoma
Chief Process Engineer and Project Manager; provided process
engineering and project engineering services for gas sweetening, natural
gas liquids extraction plants and offshore oil production pipeline
and gas separation facilities. |
|
|
|
| 1965
- 1971 |
|
Phillips
Petroleum Co., Borger, Texas and Elkhart, Kansas
Plant Supervisor and Regional
Staff Process Engr.; provided supervisory and process engineering
services to numerous natural gas liquids extraction plants.
|
|
|
|
| 1956
- 1960 |
|
Power
Service Corporation, Des Moines, Iowa
Jr. Engineer on coal fired power plant construction. |
return
to top>>
PROFESSIONAL
WORK EXPERIENCE
Major projects in which Mr. Yost has had substantial
involvement with the employers listed above include:
Bayu-Undan
Gas Recycle Project & Darwin LNG Project
Provide third party project review of basis of design, project development
plan, capital and operating costs for LNG buyer interested in potential
equity participation.
Ecopetrol
Provide preliminary project capital and operating cost estimate to
install LNG importing terminal in northeast Colombia as alternate energy
source for gas grid.
Pertamina
The Mitsubishi Corp., ABN AMRO, Bank Mandiri (Persero), Bank of
Tokyo-Mitsubishi, Ltd., Credit Lyonnais, Fuji Bank Ltd., Industrial Bank
of Japan, Ltd., The Sanwa Bank Ltd., and Société Générale
Project Manager and Process Engineer for Technical Consultant to
banking syndicate for Bontang LNG Reliability and Enhancement project
financing at P. T. Badak LNG Plant providing project Technical, Execution,
and Capital Risk Analysis for initial financing and construction monitoring.
Nigeria
LNG Ship Project Finance
Independent Engineer for CSFB in support of obtaining project finance
for Phase II LNG ships. Project manager, process engineer to provide third
party technical risk assessment, capital and operating cost estimates,
and compliance with safety and environmental requirements for the Nigeria
LNG Project Upstream Production facilities and natural gas Liquefaction,
Storage and loading facilities
Dabhol
Power Company, Enron, Industrial Development Bank of India
Independent Engineer for Indian Bank financing of Phase II Dabhol
LNG Import Terminal Project. Project Manager, process engineer to provide
third party technical risk assessment of project in support of project
financing.
Texaco
Brasil, S. A.
Project Manager, cost estimator, process engineer assisting Texaco
to prepare a proposal for an LNG Import Terminal including LPG storage
and Power Generation Plant to be installed near Fortaleza, State of Ceara,
Brazil.
Tamil
Nadu Industrial Development Corp
LNG Import Terminal Project to be installed at Port of Ennore, Chennai,
India. LNG Expert Consultant to state government in developing RFP, Technical
and Commercial Bid Evaluation, assisted negotiation of agreement between
Tamil Nadu Electricity Board and successful developer.
Pertamina/The
Bank of Taiwan, Banque Indosuez, The Chase Manhattan Bank, Fuji Bank Ltd.,
and The Long Term Credit Bank of Japan
Project Manager and Process Engineer for Technical Consultant to
banking syndicate for H Train expansion financing at P. T. Badak LNG Plant
providing project Technical, Execution, and Capital Risk Analysis for
initial financing and construction monitoring. Now providing ongoing monitoring
of project implementation until project completion.
Saga
Petroleum a.s.
Process engineer, cost estimator, Conceptual process design and cost
estimate of project to liquefy and transport gas as LNG from offshore
northern Norway to US and European markets. Study included assessment
of impact of new technology on project capital investment.
ARCO
China, Inc.
Process Engineer, cost estimator, comprehensive technical review
and development of capital and operating costs of facility options for
the import of LNG into China. The study developed a phased installation
of facilities to meet forecast increases in both base load and peak gas
demand.
Pritchard,
Black & Veatch, Inc.
Process Engineer, market study and third party technical evaluation
of revised PRICO II all-mixed-refrigerant, liquefaction process
and comparative analysis with competing liquefaction technologies.
Oman
LNG, ABN AMRO, Banque Indosuez, Bank of Tokyo, Mitsubishi, Citibank, Gulf
International Bank, Korea Exchange Bank, NatWest, and Four Export Credit
Agencies Arranging Banks and Chase Manhattan as Financial Advisor
Project manager and process engineer working as Independent Engineer
for Financial Advisor and then the Technical Bank for the Arranging Banks
for implementation of the Oman LNG Plant providing project technical,
execution, and capital risk analysis for initial financing and construction
monitoring. Also supporting Bond Offering for 25% of project financing.
Providing ongoing monitoring of project implementation through project
completion and acceptance testing.
SBM,
Inc. Chase Manhattan Bank
Project Manager, process engineer for Project Technical, Execution,
and Capital Risk Analysis to install Tantawan Project Floating Production
Storage, and Offshore loading facility offshore Thailand. Construction
monitoring, startup and completion testing.
Hardy
Petroleum, Oryx Energy, Phillips Petroleum Co., BHP Petroleum, Inpex Sahul,
Ltd., Petroz, Santos, and Emet
Project Manager and Process Engineer. Provide competitive analysis
of Timor Sea LNG Project against potential competing LNG projects for
entry into the LNG market. Existing LNG project analysis, assessment of
potential new LNG technology with capital and operating cost estimates
for liquefaction and shipping segments. Provide project management over
Stone & Webster in third party analysis of competing onshore and offshore
LNG liquefaction options.
Texaco,
Inc.
Process Engineer, develop Competitive Study of Potential Future LNG
Projects.
Rutherford-Moran
Petroleum Co.
Project Manager, Process Engineer, Gulf of Thailand, Project Technical,
Execution, and Capital Risk Analysis to install R-M/Pogo Producing Co.
Tantawan Project Floating Production Storage, and Offshore loading facility.
Amoco
Corporation
Project Manager/Process Engineer Develop capital cost estimate and
pre-feasibility design for LNG import terminals in Turkey, Israel, and
Brazil.
Amoco
Corporation
Project Manager, Sr. Consulting Engineer to develop Amoco Corporation
LNG Business Development plan. Developing 15 year business development
plan establishing a new division in Amoco with goal of becoming major
Gas/LNG energy supplier in the Pacific Rim. Study included developing
written business plan with supporting organization chart, budget, market
forecast, supply forecast, and strategic planning of selected business
opportunities. Project is proceeding exactly as planned.
Pertamina/Credit
Lyonnais and The Long Term Credit Bank of Japan
Project Manager and Process Engineer for Technical Consultant to
banking syndicate for G Train expansion financing at P.T. Badak LNG Plant
providing project Technical, Execution, and Capital Risk Analysis for
initial financing and construction monitoring. Provided ongoing monitoring
of project implementation until project completion.
Texaco,
Inc.
Process Engineer, develop in-depth analysis of potential Trinidad
LNG project.
Amoco
Corporation
Project Manager for joint venture project with Poten & Partners,
Inc. to provide strategic consulting services to Amoco including technology
transfer seminars. The goals of the study were to develop detailed understanding
of the LNG "business", to characterize the business risks of
LNG, develop recommended economic evaluation methods and computer models
that specifically support evaluation of segmented business chains of projects
that are long lived and very capital intensive. Make presentations to
Amoco Strategic Planning & Management Committees as part of Corporate
Strategic Planning decision process.
Exxon
Production Research Co., Esso Australia, Ltd., Exxon Company International
Project Manager and process engineer to provide Screening Studies
for Yemen LNG Project, Scarborough LNG Project, Papua New Guinea and Cristobal
Colon LNG Projects. Provide preliminary process analysis, heat and material
balance for project utilizing unique feed gases and potential high seismic
locations.
Petronas,
J. P. Morgan Securities, Barclays, Industrial Bank of Japan
Project Manager and Process Engineer for Technical Consultant to
banking syndicate for MLNG Dua three train expansion financing at Malaysian
LNG Plant providing project Technical, Execution, and Capital Risk Analysis
for initial loan and construction phase monitoring.
Texaco,
Inc.
Project Manager, Gorgon LNG Project Site Specific Feasibility Study
for installation of grassroots LNG facility near Karratha, Western Australia.
Provide heat and material balance, plot plans, study of potential integration
with existing Northwest Shelf LNG project, capital and operating cost
estimates.
Pertamina/Chase
Manhattan Bank and Mitsubishi Bank
Project Manager and Process Engineer for Technical Consultant to
banking syndicate for F Train expansion financing at P.T. Badak LNG Plant
providing project Technical, Execution, and Capital Risk Analysis for
initial financing and construction monitoring.
International
Finance Corporation/Shell Gas International
Process Engineer for Project Technical, Execution, and Capital Risk
Analysis to install grassroots LNG project in Nigeria. Eventual assistance
in obtaining project financing.
Woodside
Petroleum Ltd.
Project Manager, Process Engineer for Project Technical, Execution,
and Capital Risk Analysis to install Wanaea/Cossack Floating Production
Storage, and Offshore loading facility offshore Western Australia.
ARCO
International Oil & Gas
Project Manager, Process Engineer for feasibility study of installing
grassroots LNG facility at Kangean Island, Indonesia. Provided process
flow diagrams, material balance, plot plans, and 10 - 15% cost estimate
for plant facility, marine/harbor requirements, supporting infrastructure,
and required engineering, procurement, construction structure covering
grass roots installation of LNG facility in remote jungle island. Developed
evaluation for three different plant sizes.
AMPOL
Exploration, Ltd., ARCO International Oil & Gas, British Gas Co.,
ELF (CLEAG), Exxon Production Research Co., Marathon Oil Corporation,
Osaka Gas Co., Saga Petroleum a.s., Snam, Tenneco Gas Pipeline Group,
Tokyo Gas Company, Ltd., Trans-Canada Pipeline Co.
Project Manager, Process Engineer/Co-Author of Computerized Generic
Base Load LNG Facility Cost Estimate Study of 10 - 15% accuracy. Grass
roots installation of eight different LNG plant facility options covering
the plant facility and engineering, procurement, construction contractor
using U.S. rates and productivities for easy transportability to other
sites. Estimate included costs for transportation ships and receiving
terminals.
Woodside
Petroleum, Ltd.
Project Manager, Process Engineering consultant to Banking Syndicate
providing loan for Northwest Shelf LNG Project Phase III: construction
of second and third offshore production platforms, pipelines, third LNG
train of grass roots LNG facility to provide another 2 million tonnes
per year of LNG to Japan.; Provide Project Engineering/Management and
Process Engineering consulting services for new early production projects
being undertaken in the same area not necessarily related to the LNG project.
Conoco
Norway/Mosvold/Tentech/Chase Manhattan Bank
North Sea Heidrun Project for northern Norwegian North Sea. Feasibility
studies of development including onshore and offshore pipelines and fixed
production systems vs. floating production systems.
Woodside
Petroleum, Ltd.
Project Manager, Process Engineering consultant to Banking Syndicate
providing loan for Australian Northwest Shelf LNG Project Phase
II, construction of offshore production platform, pipeline, harbor and
shipping facilities, first two trains of grass roots LNG facility to provide
4 million tonnes per year of LNG to Japan.
North
West Pipeline Corporation
Feasibility study of high CO2 content gas gathering and compression
system in Western Wyoming. Separation, dehydration, gathering system optimization,
pipeline specification and compressor selection.
R.A.K.
(United Arab Emirates) - Taylor Forge Engineering Systems
Slug catcher design for 125 MMSCFD and 25 MBOPD. Process and Project
Engineer.
Shell
Oil Co., Exxon Production Malaysia Inc., Superior Oil Co., Petronas Carigali
(National Oil Co. of Malaysia), Teikoku Oil Company (Imperial Oil Co.
of Japan), Morgan Guaranty Bank, Soekor (National Oil Co. of South Africa)
- Houston, Tx; Kuala Lumpur, Malaysia; Capetown, RSA; New York, NY ; Tokyo,
Japan; London, England
Taught numerous project management, process engineering, and pipeline
design schools. Schools included courses developed by the client companies
and those authored by Mr. Yost.
Petroleum
Authority of Thailand
600 MMSCFD and 9000 BOPD pipeline and slug catcher design. Process
and Project Engineer.
Dubai
Natural Gas Co.
Offshore Compression and Quarters Platform ACP in the SW Fateh
complex and analysis of the interconnecting pipeline systems. Process
and Fire/Safety Engineer.
Petronas
Carigali
Malaysian Duyong Project of six offshore gas and condensate production
facilities. Process and Fire/Safety Engineer; Project Engineer.
Teikoku
Oil Company
Minami-Nagaoka, Japan 35 MMSCFD natural gas production plant feasibility
and conceptual design. Process and Project Engineer.
Brunei
Shell Petroleum Co.
Champion 7 Project of six major and three minor platforms providing
250 MMSCFD of compressed, dehydrated gas-lift gas, 10,000 BOPD, and 50,000
BPD water injection. Systems/Fire & Safety/Process Engineer/Project
Engineer.
Wycon
Chemical Co.
Waste Water treating facility, cleanup of contaminated soils and
ground water at plant site. Major expansions and energy optimization conversions
to ammonia, nitric acid, ammonium nitrate, urea and UAN solutions plants.
Convert ammonia plant to computer control.
Colorado
Interstate Gas Company
Installation of ammonium thiosulfate plant as tail gas cleanup unit
on Claus sulfur plant in Western Wyoming. Process and Project Engineer.
Naftagas
200 MMSCFD turboexpander natural gas liquids extraction plant. Gas
gathering system and transmission lines for residue sales to Yugoslavian
utility systems and installation of backup system from U.S.S.R. Process
& Project Engineer.
Exxon
Chemical Co.
25 MMSCFD MEA sweetening and TEG dehydration plant in Baton Rouge.
Process and Project Engr.
Phillips
Petroleum Co.
70 MMSCFD cryogenic natural gas liquids extraction plant, in Southwest
Kansas for grade "A" helium gas extraction and purification,
and helium liquefaction plant. Field Project Engineer and Plant Supervisor.
Phillips
Petroleum Co.
Propane refrigeration unit on large lean oil absorption natural gasoline
plant in Texas Panhandle. Process/Project Engineer.
Phillips
Petroleum Co.
Analysis of gas gathering systems for 25 gas processing plants in
the Texas and Oklahoma Panhandle Area, residue gas sales transmission
lines to various gas transmission companies, and projects to increase
capacity.
Phillips
Petroleum Co.
Analysis of LPG gathering and transmission system from 25 gas processing
plants in the Texas and Oklahoma Panhandle Area to refinery.
return
to top>>
PUBLICATIONS
Mr. Yost is author and teacher of several offshore and onshore production
facilities process engineering design schools which he has presented at
numerous locations worldwide. He has been on the faculty for several IGT
schools on natural gas processing and Base Load LNG projects.
return
to top>>
|
EVALUATATION
METHODOLOGY
EVALUATION
CRITERIA and SPECIFIC RISK ANALYSIS EXECUTION
PROJECT
EXPERIENCE
RESUMES
of KEY PERSONNEL
|